Innovative Design: Setting Up a 2-Story Barn with Foldable Roof for Convenient Delivery and Assembly

Writer's picture: Katie ConwayKatie Conway

Updated: Apr 26, 2024

Embracing innovation in the realm of prefab structures, a 2-story barn with a foldable roof offers a unique solution for convenient delivery and on-site assembly. This groundbreaking design allows the first floor to be delivered fully assembled, with the roof neatly folded down for easy transportation. In this article, we'll guide you through the setup process of this innovative 2-story barn.

Step 1: Site Preparation

As with any prefab structure, proper site preparation is essential. Clear the designated area of debris, level the ground, and ensure that the foundation is ready to receive the delivered structure. The efficiency of the assembly process greatly depends on a well-prepared site.

Step 2: Unloading and Inspection

Upon delivery, carefully inspect the first-floor section and all other components to ensure they are in good condition. Check for any damages that might have occurred during transit and report them promptly to the supplier.

Step 3: Foundation Installation

Prepare a stone pad that is 12x22 for a 10x20 building and 4" thick with 2a stone and a 4x6 pressure treated frame or a concrete pad that is 9'11"x19'11" and 6" thick with a 1' footer if going with a concrete pad. You will want to check with your township to see what they require for your pad. Some townships will require a 3 or 4' frost footer. You will want to know this before you begin.

Step 4: Unfolding the Roof

This innovative design features a foldable roof with hinges that allow for easy transportation. We will then deliver your building with the roof folded down and assemble the roof on site. This step requires precision to guarantee a stable and secure structure once fully assembled.

Step 6: Completing Roof Assembly

Once the first floor is securely in place, our crew will assemble the roof on site. Since the roof is folded down for delivery with a system using hinges, this process is quick and easy for our crew.

Step 7: Windows and Doors

It is important to make sure your stone or concrete pad is completely level to ensure that your windows and doors work properly. You will want to use a level to make sure that every inch of the pad is level. This is part of the warranty process, since an unlevel pad is hard on your building and may cause damage.

Step 8: Interior Finishing

Depending on the intended use of the 2-story barn, consider any necessary interior finishing touches. This may include insulation, electrical wiring, and interior walls. Customize the interior based on your specific needs and preferences.

Step 9: Final Inspections

Conduct a thorough inspection of the entire structure. Check for any loose bolts, ensure that all components are securely in place, and confirm that doors and windows operate smoothly. Address any issues promptly to guarantee a structurally sound and functional 2-story barn.

The setup of a 2-story barn with a foldable roof represents a marriage of convenience and innovation in prefab construction. By following these steps and adhering to the manufacturer's instructions, you can enjoy the benefits of a fully assembled first floor and a seamlessly unfolded roof for a hassle-free and efficient assembly process.